Telecommunication Business & Project.
  1. Ericsson BTS Systems and Minilink for 2G and 3G (Year: 2004)
    The company participated in the site acquisition, site survey, produce site documentation, deployment, installation, testing and integration of the system for MAXIS, DIGI and CELCOM. Our partners in the project were MAXIS, CELCOM and DIGI. Ericsson as its equipment system supplier and First Ancillary Terrestrial Solutions Sdn Bhd as the Project Management Consultant

  2. NOKIA Node B BTS and Minilink for 3G (Year: 2005)
    The project involves surveying, produce site documentation, installation, deployment, testing and integration of the system for Telecommunication operator CELCOM. The company was one of the pioneer companies selected for the 1 phase project implemented about 30 sites in time for the rolled out of the first 3G system. In undertaking the project the company has collaborated with CELCOM as the owner, Sapura as the project management consultant and Nokia as the equipment and system supplier.

  3. NOKIA Flexi Hopper 3G Systems (Year: 2006)
    The project involves the deployment , installation, testing, integration and produce site documentation of the above NOKIA system. In undertaking the project the company has collaborated with CELCOM as the owner, Sapura as the project management consultant and Nokia as the equipment and system supplier.

  4. Government Integrated Radio Network Project (TETRA-GIRN) (Year: 2007)
    We have been awarded the Site Preliminary Survey Project by Sapura Holdings Berhad for the state of Negeri Sembilan.

  5. Ericsson / DiGi Traffic Node (Year: 2007)
    The project involves the deployment, installation, testing and produce site documentation of Ericsson System. In undertaking the project the company has collaborated with Digi as the owner, First Ancillary Terrestrial Solutions Sdn Bhd as the project management consultant and Ericsson as the equipment and system supplier.

  6. Government Integrated Radio Network Project (TETRA-GIRN) (Year: 2007)
    We have been awarded as panel contractor for the pre site survey, site hunting and site acquisition works for 154 sites at Central, Eastern and Southern Region for the proposed base station (BS) and microwave system (MW) sites for the nationwide secure digital government integrated radio network (GIRN) system (Peninsular Malaysia).

  7. Government Integrated Radio Network Project (TETRA-GIRN) (Year: 2008 & 2009)
    To supply and deliver 20 Liter Heavy Duty Jerrycan , Mobile Generator, Uninterruptible Power System, Auto Voltage Regulator, UTP Network Cable, Network Equipments, Tools and MSB MS-12-18 (12V 18AH) Sealed Rechargeable Battery complete with RF-5-5V (5mm) Cable Lug.

  8. Government Integrated Radio Network Project (TETRA-GIRN) (Year: 2008)
    We have been awarded by Sapura Holdings Berhad the main contract for the proposed installation and commissioning services of base station (BS) and microwave system (MW) sites in Peninsular Malaysia for the proposed nationwide secure digital government integrated radio network (GIRN) system.

  9. Government Integrated Radio Network Project (TETRA-GIRN) (Year: 2008)
    We have been awarded by Sapura Holdings Berhad the main contract for the proposed installation and commissioning services of base station (BS) and microwave system (MW) sites in East Malaysia for the proposed nationwide secure digital government integrated radio network (GIRN) system.

  10. Engineering Services for Maxis Pasolink Project (Year: 2010)
    We have been awarded as a main contractor for the proposed installation and commissioning services for Maxis Pasolink Project in Peninsular Malaysia.

  11. Engineering Services for RMPnet Project (Year: 2012)
    We have been awarded by Masterplan the consultant to Royal Malaysian Police as main contractor for the proposed site preparation, installation, testing and commissioning services for RMPnet Project in Peninsular & East Malaysia.

  12. Engineering Services for TM NGN-AG Project (Year: 2012-2015)
    We have been awarded as a main contractor for the proposed survey, installation, migration/integration, testing and commissioning of NGN-AG Project for Telekom Malaysia Berhad in Peninsular Malaysia.

    Information Technology Business & Project.
  1. GITN Sdn Bhd (Year: 2006)
    To Supply, Deliver, Install and Testing of PacketShaper 1550 – up to 512Kbps

  2. Dewan Bandaraya Kuala Lumpur (Kuala Lumpur City Hall) : Real Time Traffic Information Systems Project (Year 2006 & 2007)
    The systems implemented provides convenience for public to check for Kuala Lumpur traffic information including:-
    • Live Traffic
    • Traffic Diversion
    • Traffic Management
    • Flash Flood Area
    • Other Traffic Related Info
    This advance system relies on a system that enables it to stream live traffic at selected area under area mode surveillance via Dewan Bandaraya Kuala Lumpur website: http://www.dbkl.gov.my (trafik terkini) or 3G mobile phone. The information obtained will enable viewer to make decision in real time of their traffic route consideration and others affecting their daily lives.

  3. BSMART Telematics Services : AVLS [Automated Vehicle Location System]
    Installation and Testing of 1,652 units RapidKL Buses in 1.5 months. (Year: 2006)

    This device which has only concurrent GPS and GSM positioning capability in the world (according to Delloitte Malaysia) is to be installed in vehicle and provides vehicle tracking and location information and others at any given time. As a productivity and cost saving tools they are recommended for commercial vehicle operators and logistic service operators where transport maintenance, productivity and timeless of delivery are of paramount importance.
    We are proud to be associated, with this great product as a distributor, marketing agent, installation services and maintenance service provider in Malaysia. We have to date successful installed and maintained he device on public buses, taxis and several government agency vehicles.

  4. Universiti Tun Hussein Onn - ELLIS Courseware (Year: 2007)
    Being Award by the Universiti of Tun Hussein Onn to supply, install, configure, testing and training for the ELLIS software. (English Language Learning Instruction System).

  5. Universiti Malaysia Pahang - E-Library System (Year: 2007)
    To Supply, Deliver, Deployment and Testing of E-Library Barcode Scanner Systems, Thermal Printer and Barcode Label Printer.

  6. Dewan Bandaraya Kuala Lumpur (Year: 2007)
    To Supply, Deliver, Installation, Testing, Integration and Maintenance Services of Horizontal UTP Structured Cabling and Network Switch for Jabatan Perancang Ekonomi dan Penyelarasan Bangunan.

  7. Jabatan Parit dan Saliran (Year: 2007)
    To Supply, Deliver, Install, Testing, Integration and Maintenance Services of Horizontal UTP Structured Cabling and Network Switch.

  8. Dewan Bandaraya Kuala Lumpur ITIS – ATIS Maintenance Project (Dec 2010 till Dec 2012)
    Maintenance of Advanced Traveler Information System for Integrated Transport Information System Including Web Maintenance, SMS Gateway Related Services and Wireless Traffic Web Cam System Related Services.

  9. Dewan Bandaraya Kuala Lumpur ITIS (Year: 2012)
    Upgrading ITIS 3G Camera ( Wireless Traffic Webcam System ) As Traffic Data Collection For Integrated Transport Information System ( ITIS ), Jabatan Pengangkutan Bandar, Dewan Bandaraya Kuala Lumpur.

  10. BSMART Telematics Services (Year: 2012)
    Installation and Testing of b’AT A500 (BSMART Access Terminal A500) in Middle East.